MOD’s new operational training buildings making huge carbon savings
28 November 2024
Transforming Education: Progress on Wombourne High School’s New State-of-the-Art Facilities
9 December 2024

New accommodation under construction for junior ranks at RAF Marham

On 29 November 2024, RAF Marham Stn Cdr, Gp Capt L Boyd visited the Red 10 construction site for the new accommodation blocks on camp. RAF Marham is the home of the F-35B Lightning, a 5th Generation, multi-role, stealth fighter. The Station is also home to a range of engineering support functions from maintenance to frontline support.

A ceremony has been held at RAF Marham to mark the start of work on the second of four new Single Living Accommodation blocks for personnel at RAF Marham.

The Defence Infrastructure Organisation (DIO) contracted modular construction specialist Reds10 to deliver the modular blocks on behalf of the RAF. Each block will provide 94 single bed spaces, each with en-suite bathroom, as well as kitchenettes, communal space, equipment storage and laundry facilities.

The SLA modules will be manufactured at Reds10's offsite factory facility in East Yorkshire before being transported to RAF Marham to be assembled on site. This method of construction is faster than traditional methods, maximising productivity, quality and control and minimising disruption. While construction is starting on the second block, the first is nearing completion. All of its modular components are in place and work is now taking place internally, such as electricity and plumbing connections. 

Each block is designed to high energy efficiency standards, using air source heat pumps for heating and hot water and utilising photovoltaic panels and a SMART building management system which ensures it runs as efficiently as possible. 

"Some of the accommodation at RAF Marham is maintenance intensive and in need of replacement. We're really pleased to be making progress with these new accommodation blocks, which will ensure that Junior ranks stationed here get the quality of accommodation they deserve".

Marcus Blair, Principal Project Manager, Defence Infrastructure Organisation

"It's great to see the building of the new Single Living Accommodation progressing so well and I look forward to seeing the first Junior Ranks utilising the new blocks as they come online next year. We are keen to show some of our personnel around the building prior to its completion to get their input on how best to make use of the communal spaces."

Group Captain Leonie Boyd, Station Commander, RAF Marham

"Ensuring the armed forces have modern, comfortable and energy efficient homes is vital for them to live and thrive and it's great to see the progress being made on the new accommodation at RAF Marham. Our close working partnership with the DIO has enabled us to progress the design and build of high-quality and sustainable housing for the RAF, using industrialised methods of construction which deliver exceptional value to the public sector".

Phil Cook, Defence Director, Reds10

Alongside the four new SLA blocks are a number of Temporary Accommodation Units also provided by Reds10, which are nearing overall completion with some already occupied. These are intended to be a short-term solution to accommodation shortages and can be transported from site to site as needed. This allows personnel to live in them temporarily while new accommodation is under construction, as in this case. 

Ready to discuss your next project?

Get In Touch

We use cookies

We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalised content and targeted ads, to analyse our website traffic, and to understand where our visitors are coming from. By browsing our website, you consent to our use of cookies and other tracking technologies.
Read more