- Reds10 were required to work collaboratively with all project stakeholders to develop proposals for this 4000m2 Academy.
- Successful management the planning application process, whilst ensuring a fully coordinated design that fulfils the client’s vision and requirements.
- We developed and maintained relationships with the neighbours including Seabright School and Friends of Haggerston Park, to ensure a successful Planning Application.
The dormant site was located in the heart of Hackney with neighbours directly overlooking the existing site. The close proximity of the neighbours challenged the design team to develop a building whilst not impeding on the neighbours’ Right to Light. The challenge was exacerbated by clients’ spatial requirements and the strict timeframe.
Reds10 provided a consultancy-led approach to oversee all Stage 1 design and planning activities. A Planning Consultant and Right to Light Surveyor were appointed to further assist with public consultation. Reds10 also took the scheme through a PPA process, allowing the designers to tailor the proposed development to the Council’s aspirations, so reducing the risk when it came to Planning Approval. Once approval was granted, the construction team continued to liaise with neighbours and were credited a ‘Very Good’ score by the Construction Safety Scheme.