THOMAS TELFORD PRIMARY FREE SCHOOL

THOMAS TELFORD PRIMARY FREE SCHOOL

  • Delivered through the Department for Education Free Schools Programme, Reds10 provided a new two-storey primary school and nursery for the growing Priorslee community.
  • Creating much-needed educational capacity with modern learning environments, extensive outdoor facilities and dedicated nursery provision.
  • Manufactured and assembled using industrialised construction, Reds10 enabled efficient delivery while maintaining programme certainty and quality.
Location Priorslee, Telford
£ 17 m
Project Value
420 pupils
+ 26-place Nursery
78 modules
Delivered Using MMC

Delivered through the Department for Education’s Free Schools Programme, the project provides a new two-storey primary school and nursery within the rapidly growing Priorslee development. Constructed using Modern Methods of Construction (MMC), the school offers high-quality learning environments alongside extensive sports and outdoor facilities, supporting the educational needs of both existing and future residents.

The development includes a floodlit Multi-Use Games Area, floodlit netball court, sports pitches, nursery play space, cycle storage, landscaping works and dedicated habitat areas. Sustainability has been embedded throughout the design, incorporating photovoltaic panels, air source heat pumps, a green roof and electric vehicle charging infrastructure to support Net Zero Carbon in Operation objectives.

Video Poster

The Challenge

Thomas Telford Primary Free School was delivered on a greenfield site with significant level variations across the development area. Extensive earthworks and ground remediation were required to create suitable development platforms for both the school building and surrounding external works, while ensuring high-quality landscaped and sports areas for future users.

Following completion of the Pre-Construction Services Agreement, the project was placed on hold at the Client’s instruction, delaying the programme for the permanent school. To maintain continuity of education, Reds10 proposed and delivered a temporary two-storey school building on the same site. This allowed the school to operate uninterrupted while construction of the permanent facility progressed.

The project was further complicated by the concurrent delivery of both temporary and permanent school facilities within the same site boundary. Careful planning and strong coordination were required to manage construction activities, site logistics and health and safety arrangements while maintaining a live educational environment.

Located within an active housing development, the site was surrounded by ongoing residential construction and unadopted roads. Close collaboration with neighbouring developers and stakeholders was essential to successfully manage site access, traffic movements and deliveries throughout the programme.

The Solution

Reds10 adopted our industrialised construction approach to accelerate programme delivery, improve quality and reduce on-site activity. The two-storey school was manufactured and assembled using MMC, enabling efficient installation of 78 modules while maintaining programme certainty despite challenging weather conditions and a constrained development environment.

To ensure uninterrupted education provision, Reds10 delivered a temporary 750m² school building complete with a Multi-Use Games Area, landscaping and parking facilities. The temporary accommodation was handed over in August 2025, allowing the school to operate successfully while construction of the permanent facility continued.

Ongoing engagement with neighbouring developers, local stakeholders and the wider community ensured that site logistics were carefully coordinated throughout the project. Planned delivery strategies, robust traffic management arrangements and regular communication helped minimise disruption within the surrounding residential development.

The completed school has been designed to support long-term sustainability objectives through the inclusion of:

  • Air Source Heat Pumps.
  • Solar PV panels to roofs and canopies.
  • Smart Building Management System monitoring energy performance.
  • Intelligent classroom ventilation controls.
  • Green roof and biodiversity enhancements.
  • Modern Methods of Construction.
  • Electric Vehicle charging infrastructure.

The Result

The completed development provides a modern 420-place primary school and 26-place nursery, creating much-needed educational capacity within one of Telford’s fastest-growing residential communities.

The project was delivered within programme through the effective use of Modern Methods of Construction, with the main school handed over on schedule and final completion achieved ahead of plan. The new facility offers flexible teaching spaces, high-quality outdoor environments and extensive sports provision, creating a positive learning environment for pupils and staff alike.

Designed to achieve Net Zero Carbon in Operation requirements, the school incorporates a range of low-carbon technologies and sustainability measures. Predicted operational carbon reductions of 34,199 kgCO₂ per year and annual energy savings of 22,124 kWh demonstrate the environmental benefits of the development.

Through collaborative working, careful programme management and industrialised construction techniques, Reds10 has delivered a sustainable and future-proof educational facility that will support the local community for generations to come.

Sustainability and Social Value

The project has been designed to meet the Department for Education’s Net Zero Carbon in Operation requirements, incorporating renewable energy technologies and energy-efficient building systems throughout.

Biodiversity improvements include the introduction of new planting, additional trees, habitat areas and a green roof, increasing ecological value across the site while supporting local wildlife. The development also contributes significant social value by providing new school places at the heart of the expanding Priorslee community, ensuring access to education for both current and future residents.